Past
Projects as of July 2009 |
|
Project(s)
|
Clients/Customer
|
Scope of Works |
Value (USs)
|
Year(s)
|
|
Grid Operation Department |
Nepal
Electricity Authority (NEA) |
Supply, Delivery, and Commissioning of 45 MVA, 132/66kV
Transformer and Linebay for Interconnection with 66 kV Line
Under Contract Number GOD/2063/64-11 |
1,477,000 |
2007 - 2009 |
|
Grid Operation Department |
Nepal
Electricity Authority (NEA) |
Supply, Delivery, Installation, Testing and Commissioning of
33/11kV, 16.6MVA Power Transformer at Butwal Substation Under
Contract Number GOD/2063/64-06 |
566,200 |
2007 - 2009 |
|
Grid Operation Department |
Nepal
Electricity Authority (NEA) |
"Supply, Delivery and Commissioning of Equipment for Busbar
Re-arrangement" Under Contract Number GOD/2063/64-03 |
457,000 |
2007 - 2009 |
|
Rapti Bridge, Nepalgunj-Bhagauda Road |
ANK Constrction/ Department of Road, Government Of Nepal |
Fabrication and Erection of Steel Truss 6x50mtr. (300mtr.) Long
Bridges, Total 6x120 tons |
170,500 |
2002 - 2009
Details |
|
70 MW Middle Marsyangdi,
Lot-E |
Alstom Power, Germany |
Assembling of 2x36 MW Generators and Erection, Testing and
Commissioning of 12kV Generation control & Protection Panels and
Switchgear |
661,000 |
2004 - 2008 |
|
70 MW Middle Marsyangdi, Lot
HSS |
MCE Industrietechnik GmbH & Co., Austria |
Fabrication, Erection, Testing & Commissioning of Manifold,
Penstock Pipes of 5.5M Dia. & 450M Long, Total 1200 Tons |
423,500 |
2004 - 2008 |
|
70 MW Middle Marsyangdi, Lot
HSS |
MCE Industrietechnik GmbH & Co., Austria |
Erection, Testing & Commissioning of all Hydraulic Gates, Trash
Racks, Stoplogs Structures |
263,000 |
2004 - 2008 |
|
Transmission Line/Substation
Construction Department |
Nepal
Electricity Authority (NEA) |
Design, Supply and Construction of 30MVA,132/33kV "Chandranighapur
Substation" Under the Contract Number ICB-CSR 2005/06-1 |
2,500,900 |
2006 - 2008 |
|
70 MW Middle Marsyangdi, Lot
HSS |
Asdritz Hydro GmbH, Austria |
Fabrication and Supply of Hydraulic gates, trash racks and
structures, total 1600 tons |
423,500 |
2007 - 2007
Details |
|
4x84MW Chhukha Hydropower
Station |
Druk Green Power Corporation Limited, Bhutan |
Reclamation of 3 Numbers pf 84MW Pelton Runner (3.6m dia. & 16
Tons) Under Contract Number CHPCL/O&MW/06/2006 |
275,000 |
2006-2008 |
|
Dolhka Branch, Charikot |
Nepal
Electricity Authority (NEA) |
Design, Construction, Supply, Installation Testing &
Commissioning of 1.5MVA, 33/11kV Kirne Substation |
315,000 |
2006 - 2007 |
|
Community Rural Electrification
Department |
Nepal
Electricity Authority (NEA) |
Design, Supply, Installation, testing and commissioning of
1.5MVA, 33/11 kV Power Lines Under the Contract Numbers CRED/061/062-42
& 44 in Gulmi District |
750,000 |
2005 - 2007 |
|
Grid Operation Department |
Nepal
Electricity Authority (NEA) |
Construction of 132/33 kV Transformer Bay & Repair, Shifting,
Installation and Commissioning of 10MVA Transformer at Damauli
under Contract No. GOD - 2062/063 – 04 |
194,620 |
2006 – 2007 |
|
Grid Operation Department |
Nepal
Electricity Authority (NEA) |
Maintenance, Shifting, Installation and Commissioning of 20MVA
Power Transformer at Lahan with Supply of accessories under
Contract No. GOD - 2062/063 – 03. |
171,531 |
2006 - 2007 |
|
Generation – Operation & Maintenance Deptartment |
Nepal
Electricity Authority (NEA) |
Design,
Supply, Delivery, Installation, Testing & Commissioning of
132/33 kV, 15 MVA Switchyard Expansion at Modi Hydro Power
Station" under Tender No. 061/062-Gen.OMD-MKHPS-02. |
608,000 |
2006 - 2007 |
|
144 MW Kali Gandaki "A" Power Station |
Mitsui &
Co. Ltd. and Nepal Electricity Authority |
Repairing
of 2 Francis Runners (each of dia 2.6m dia and weight 8ton), 100
pcs. of Wicket Gates and Upper & Lower Wearing Rings and design
& manufacturing of Runner Rotating Device |
253,000 |
2006 |
|
4 MW Khudi |
Khudi
Hydropower Ltd. |
Design,
supply, fabrication, erection, testing and commissioning of
complete Hydro mechanical works and Manifold, 2.5 km Penstock
Pipes |
970,000 |
2005 - 2006 |
|
Grid Operation Department |
Nepal
Electricity Authority (NEA) |
Supply,
Delivery and Commissioning of 15 MVA, 66/11 kV Power Transformer
at Birgunj under Contract No.: GOD 2061/062 – 05 |
340,000 |
2005 - 2006 |
|
Grid Operation Department |
Nepal
Electricity Authority (NEA) |
Supply, Delivery and Commissioning of Equipment for Kusaha
Switching Station under Contract No.: GOD-2061/062 – 10 |
147,140 |
2005 – 2006 |
|
500 kW
Rairang
|
Rairang
Small Hydropower Dev. Co. Pvt. Ltd. |
Fabrication, erection, testing and commissioning of Manifold,
Penstock Pipes |
114,865 |
2003 - 2004 |
|
70 MW Middle Marsyangdi,
Lot M |
Voith
Siemens, Germany |
Fabrication
of steel draft tube liners, Spiral casings, stay rings and pit
liners for 2 x 35 MW vertical Francis Turbines |
201,730 |
2002 - 2004 |
|
Rapti Bridge, Dang |
Shakti
Hardwares/ Department of Road, Govt. Of Nepal |
Fabrication
and erection of steel truss 7 x 48m long bridges, total 7 x 120
tons |
170,500 |
2001 - 2002 |
|
Modi Khola Substation
|
Nepal
Electricity Authority (NEA) |
Construction, supply, installation and commissioning of 5 MVA,
132/33 kV substation equipment |
214,103 |
2002 - 2003 |
|
Panchkhal Substation
|
Nepal
Electricity Authority (NEA) |
Construction, supply, installation and commissioning of 5 MVA,
66/11 kV substation equipment. |
348,101 |
2002 - 2003 |
|
20 MW Chilime, Lot No. 3 |
VA TECH Hydro Ltd., India |
Erection,
testing and commissioning of Mechanical and Electrical equipment
and 28 MVA, 11/66 kV Switchyard |
109,589 |
2001 - 2003 |
|
20 MW Chilime, Lot HMW |
Chilime
Hydropower Co. Ltd. |
Design,
manufacture and erection of gates, stoplogs and trashracks. |
271,570 |
2000 - 2003
Details |
|
20 MW Chilime,
Lot C |
Larsen and
Toubro Ltd., India (L&T) |
Manufacture, erection and testing of the Manifold, Y-type
Bifurcation and penstock Pipes |
1,003,340 |
2000 -
2003 |
|
Kali Gandaki "A" Lot 5 |
Alstom
Power, France |
Erection,
Testing and commissioning of 3 x 56.5MVA and a 5MVA Power
Transformers, 132 kV GIS and 12 kV Breakers. |
125,450 |
2000-2001 |
|
60 MW Khimti - I |
Himal Power
Limited (HPL) |
Supply,
installation, testing and commissioning of 70 MVA, 11/132 kV
Switchyard |
875,000 |
1998 - 2000
Details |
|
14 MW Modi
|
Hyundai
Engineering Co., Ltd., Korea |
Installation, testing and commissioning of Powerhouse
Electro-mechanical equipment including 18 MVA, 11/132 kV
Switchyard at Modi and 5 MVA,132 kV Substation in Pokhara |
138,141 |
1999- 2000
Details |
|
Kali Gandaki “A”, Lot 4 |
DSD Noell
GmbH, Germany |
Fabrications of sluice way steel liners, Extension of Sluice way
liners, bulkheads, embedded parts and anchor plates |
|
1998-1999
Details |
| 6.2 MW Puwakhola
(Ilam) |
Nepal
Electricity Authority (NEA) |
Design, manufacturing,
erecting and commissioning of 1,012 m long steel penstock pipe,
hydraulic gates, trashracks and stoplogs. |
660,308
|
1997- 2000
|
|
Mankamana
Cable Car
|
Himal Hydro
& General Construction Ltd. |
Fabrication
of 20 sets of steel towers from 15 - 45m high and accessories
including foundation bolts for 2.8 km long cable car system. |
161,408 |
May
- Oct 1998 |
| Rolling Mill
Expansion |
Himal Iron
& Steel Pvt. Ltd. |
Design and
manufacturing of Power Distribution Boards and Motor Control
Centers for 3.5 MW capacity. |
|
1998 |
| 12 MW
Jhimruk
|
Butwal Power
Company Limited (BPC) |
Design and manufacture
of gates, trashracks and penstock pipe with manifolds.
Manufacture of
3 x 4.2 MW Francis turbines (except runners) with accessories.
Assembly of governors,
30/5 ton overhead crane and 6.6 kV generation, 132 & 33
kV Transmission and all LV AC/DC control panels.
Installation
and commissioning of electrical, mechanical and hydraulic
equipment including 3 MVA, 33 kV and 15 MVA, 132 kV Substations
at Jhimruk and Lamahi. |
1,323,559
|
1991- 1994
|
|
250 kW Darchula SHP Centre, Darchula |
Nepal
Electricity Authority (NEA) |
Design and manufacturing of 250 kW
Francis turbine & accessories, hydraulic mechanical governor and
control panel and erection and commissioning of all equipment. |
108,333
|
1992 |
| 5.1 MW Andhikhola |
Butwal Power
Company Limited (BPC) |
Design and manufacturing
of penstock pipes, manifolds, radial & slide gates and
5.3 kV generation & 33 kV transmission control panels.
Site erection and
commissioning of complete Hydro-Mechanical and Electro-Mechanical
equipment including 6 MVA, 33 kV switchyard.
|
1,041,660
|
1987- 1990
|