Rolling of 3,500mm diameter
steel liner using the rolling machine at our Butwal factory. |
Moving heavy equipment
into the powerhouse before installation required the use
of our 15 Tonne mobile crane. |
Sliding gates at the intake
to the desanding basin. The gates were made in Korea
and installed by us. |
Steel liner sections in
our Butwal factory awaiting shipment to site. |
Inside the powerhouse
after installation. The photograph shows one of
the generators, cooling pipework and control panels. |
View of the powerhouse
and switchyard following installation. |