| Rolling of 2m diameter
penstock with thickness of 30mm using the rolling machine
at our Butwal factory. |
Site commissioning of
control panels. Individual panels were assembled
in our workshops at Butwal before shipping to site. |
Final checking of turbine
housing by assembly of parts. |
Penstock sections in our
Butwal factory awaiting shipment to site. |
Overall view of the switchyard
at the powerhouse site. |
Installed turbines in
the underground powerhouse |