|
Home > Current
Projects > Rapti Bridge
Building and
installing the mechanical structures of these girder bridges has brought
different challenges from those of our normal hydropower related
projects. There were a large number of holes to be drilled and all
the pieces needed to assemble at the "remote" site without
problems. Identification and checking of the large number of
component parts was a challenge in itself |