Rapti River Bridge

       
  Rapti Bridge
 
 
 
 

Home > Current Projects > Rapti Bridge

 

Building and installing the mechanical structures of these girder bridges has brought different challenges from those of our normal hydropower related projects.  There were a large number of holes to be drilled and all the pieces needed to assemble at the "remote" site without problems.  Identification and checking of the large number of component parts was a challenge in itself

Project Specification

Type of project Steel girder road bridge
Specification 300m length in 6 spans between concrete pillars
Customer Roads Department of the Nepal Government
Dates of NHE work January 2002 to date

 

Scope of NHE work

  Design from outline drawings and manufacture 
 

Manufacture, blast cleaning and painting of the steel girder components

 

Installation of the girder structure at site

  

Photo gallery

View of the completed assembly prior to final painting

Trial assembly of a small section in our workshop

Looking along the bridge before final painting and laying concrete View of the bridge from below
 

The scene in our workshop during manufacture of girder components

At the site during early stages of the assembly

 