The Chilime HEP has been significant for us in that we were responsible for all aspects of the penstock pipe.  This included design and factory pressure testing of the bifurcation joint.  We also used the opportunity of the contract to design, manufacture and instal the gates to review and improve our designs for roller and sliding gates.  One of the roller gates, 4m x 5m in size, was also the largest we have made.

Project Specification

Type of project Construction of plant for generation of electricity
Specification 20 MW from 2 Pelton turbines.
Customer Chilime Hydropower Co. Ltd.(Nepal)  

Larsen and Toubro (India) and VA Tech (India)

Dates of NHE works March 2000 - August 2003

Scope of NHE work

1. Design, manufacture, installation, testing and commissioning of 650m long, 350m static head penstock pipe including bends and bifurcation.
2.

Design, manufacture, installation, testing and commisioning of all gates, stoplogs, trashracks and related steel structures.

3.

Installation of powerhouse equipment (turbines, generators, control and relay systems, firefighting system).

4. Installation of 132kV GIS & Switchyard and fabication of steel supports for equipment.

  

Photo gallery

Bifurcation pipe in our workshop with temporary end plugs for static pressure testing.
Small sliding gate during installation
The Reservoir Outlet Roller Gate, 4.2 m x 5 m, following installation and handover
 

Inside the bifurcation following installation.

 
The Tunnel Inlet Trashrack, 4.2 m x 9.5 m following manufacture and installation.
A sliding gate following installation.

Welding during installation of the horizontal section of penstock pipe

Assembly of control panels in the powerhouse

    View of the powerhouse during installation of the two pelton turbines for VATech.