Home
> Past Projects > Chilime
The Chilime
HEP has been significant for us in that we were responsible for
all aspects of the penstock pipe. This included design and
factory pressure testing of the bifurcation joint. We also
used the opportunity of the contract to design, manufacture and
instal the gates to review and improve our designs for roller and sliding gates.
One of the roller gates, 4m x 5m in size, was also the largest we have
made. |
|
Project Specification
| Type
of project |
Construction
of plant for generation of electricity |
|
Specification |
20 MW from 2
Pelton turbines. |
| Customer |
Chilime Hydropower
Co. Ltd.(Nepal)
Larsen and Toubro
(India) and VA Tech (India) |
| Dates
of NHE works |
March 2000 - August 2003 |
Scope
of NHE work
| 1. |
Design,
manufacture, installation, testing and commissioning of 650m
long, 350m static head penstock pipe including bends and bifurcation.
|
| 2. |
Design,
manufacture, installation, testing and commisioning of all
gates, stoplogs, trashracks and related steel structures.
|
| 3. |
Installation
of powerhouse equipment (turbines, generators, control and
relay systems, firefighting system).
|
| 4. |
Installation
of 132kV GIS & Switchyard and fabication of steel supports
for equipment. |
Photo gallery
|  |
 |
 |
Bifurcation pipe
in our workshop with
temporary end plugs for static pressure testing. |
Small
sliding gate during installation |
The Reservoir Outlet
Roller Gate,
4.2 m x 5 m, following installation and handover |
Inside the bifurcation following
installation.
|

|
 |
|
The
Tunnel Inlet Trashrack, 4.2 m x 9.5 m following
manufacture and installation. |
A
sliding gate following installation. |
Welding during installation
of the horizontal section of penstock pipe
|
Assembly of control panels
in the powerhouse |
 |
| |
|
View of the powerhouse during
installation of the two pelton turbines for VATech. |
|
|